Heavy Lifting · Since 1874

Field Notes & Engineering Briefings

Crawler crane lift planning · Hydraulic excavator maintenance · Undercarriage wear · Boom length selection

Manitowoc Parts: A 10-Step Pre-Order Checklist (Learned the Hard Way)

Seven years of Manitowoc parts ordering, six expensive mistakes, and the 10-point checklist we now run before any purchase order goes out. Covers Grove, Potain, National Crane, Manitowoc ice machine replacement parts, and the oddball keywords (willow pump, skull crusher) that show up on the wrong purchase orders.

2026-11-03 · Diego Ferreira

The Cheapest Equipment Quote Is Almost Always the Most Expensive One

After four years of quality audits on mining and construction equipment, I've stopped approving purchases based on unit price. Here's the TCO framework I use instead—and why the cheapest quote on an Atlas Copco hydraulic power pack or a basic drill press rarely wins.

2026-11-03 · Charlotte Avery

You're Buying the Bucket, Not the Excavator

After four years and 200+ used machine inspections a year, the hour meter is the last thing I check. Here is what actually determines whether a used excavator makes or loses money for a wholesale dealer — and why the bucket, the pins, and the parts channel matter more than anything else on the listing.

2026-09-30 · Petra Lindholm