Heavy Lifting · Since 1874
Link-Belt Lattice Boom Class

Link-Belt Crawler Crane for Bridge Precast & Plant Lifts

220 t class lifting capacity at short radius · 76 m boom length with luffing jib options · Tier 4 Final diesel · hoist speed tuned for segment placement cycles.

  • Lifting capacity 220 t @ 3.5 m
  • Boom length up to 76 m main
  • Engine 298 kW · EPA Tier 4 Final
Link-Belt crawler crane lifting precast bridge segment
3,200+Units shipped annually
85+Countries on active jobsites
1874Founding year of the brand
8,000hMajor component overhaul cycle

Project Milestones Across Lift & Excavation Fleets

  1. 2018

    1,140 km corridor earthworks

    Hydraulic excavators with 1.6 m³ buckets kept gradeability targets on soft subgrade.

  2. 2020

    288-segment viaduct lift

    Lattice boom crawler crane held ASME B30 lift plans through monsoon windows.

  3. 2022

    Quarry mass excavation package

    Forty-two excavators delivered with ISO 4406 hydraulic cleanliness logs.

  4. 2024

    Coastal plant module set

    Telescopic cranes staged modules with documented slewing speed and ground pressure checks.

Urban building demolition with high-reach excavator

Building Demolition

Highway earthworks with crawler excavators

Highway Earthworks

Bridge precast segmental lift with crawler crane

Bridge Precast Lift

Quarry excavation with hydraulic excavator

Quarry Excavation

"We placed 288 bridge segments with one Link-Belt crawler crane and zero rework. The published load chart matched the rainy-season lift window without mid-project reconfiguration."

Lifting Superintendent · Precast viaduct yard, Southeast Asia · 288-segment contract

290,000 m²Production area under roof
3,800Employees worldwide
85+Countries with active fleets
200+Certified field service engineers
Night shift crawler crane and excavator fleet on jobsite

From Load Chart to First Lift — One Field Partner

Concept-to-commissioning support across crawler cranes, telescopic cranes, and hydraulic excavator fleets with CE, ISO 9001, and EPA Tier 4 Final documentation packs.

Talk to a Field-service Engineer