Heavy Lifting · Since 1874

Contact Link-Belt Field Dispatch & Engineering

Reach 24/7 lift dispatch, excavator parts desks, and project engineers for crawler crane quotes, hydraulic excavator rebuilds, and regional hub mapping.

Map illustration of Link-Belt Lexington headquarters and regional hubs

Headquarters Plant

Address: 2651 Palumbo Drive, Lexington, KY 40509, USA

Hours: Mon–Fri 06:00–22:00 EST · Sat 08:00–16:00 EST

Social: LinkedIn · YouTube field channels for lift briefings

Field-service Hotline

24/7 dispatch for contracted crane and excavator sites · target under 18h MTTR

+1-800-555-2487

Engineering Team

Boom load charts, hydraulic SOPs, digging depth studies · reply within 24 hours

[email protected]

Spare Parts Hub

Regional warehouses for undercarriage, hydraulic kits, and crane attachments

Lookup a Part

Send Specs to Our Field Team

Include company, country, equipment class, required lifting capacity or digging depth, and whether EPA Tier 4 Final documentation is mandatory for your tender.